Concept Design

Commercial buildings & campuses

For facilities directors accountable for central plant, occupied buildings and controls contractors across a campus or portfolio.

Finding an air-handling fault that returns after the work order closes

A BMS alarm may clear after a controller reset while a damper or actuator continues to stick under load. The maintenance platform counts a completed visit, but the same zone generates fresh complaints on the next occupied day.

Workflow at a glance
  1. Source recordsBMS trends and work orders
  2. ProcessingLink recurrent symptoms to equipment
  3. Decision ownerFacilities engineer
  4. Operational outputVerified repair outcome

Implementation approach

Map the alarm and affected zones to the physical air handler. Compare approved commands, measured response, occupancy and visits across repeated operating periods. Route a recurrence to the responsible controls or mechanical contractor with the relevant trend window.

Exceptions and operating controls

The engineer establishes what constitutes a fault and what evidence demonstrates repair. Suppress repeated notifications while a job is active without suppressing the underlying evidence.

Illustrative operating scenario

A work order closes on Friday during light occupancy. On Monday, command and feedback diverge again. The facilities lead can reopen the same issue with evidence from both visits.

Acceptance test and handover

Check repeat callouts per asset and whether corrective work survived a comparable occupied period. Validate the asset-to-point mapping on site before expanding across buildings.

Industry evidence

The Australian Government describes the role of building management systems in supervising commercial HVAC equipment. Australian Government HVAC guidance on building management systems

BACnet is a building automation and control communications protocol. Installed device capabilities and local control sequences still need to be verified. BACnet International on building automation interoperability

Coordinating tenant after-hours cooling with zone and meter boundaries

A tenant can book after-hours air conditioning for one floor while the BMS controls several shared zones. The booking portal, building schedule and meter boundaries can describe different portions of the building.

Workflow at a glance
  1. Source recordsBookings, zones and calendars
  2. ProcessingResolve shared plant demand
  3. Decision ownerBuilding operator
  4. Operational outputConfirmed run and service record

Implementation approach

Map each approved tenancy request to the served zones, plant schedule and metering boundary. Detect overlapping bookings and closures. Return the confirmed schedule or a specific exception to the tenant operations desk.

Exceptions and operating controls

A facilities operator approves unusual occupancies, changed zoning and manual extensions. Keep fire and life-safety controls separate. Record the actual run window alongside the requested one for review.

Illustrative operating scenario

Two tenants book overlapping evening hours on a shared air handler. The equipment needs one continuous operating period, while the building manager still needs separate records for each request.

Acceptance test and handover

Rehearse simultaneous bookings, cancellation after start and a holiday schedule. Compare requested service, confirmed run and meter coverage before issuing tenant reporting.

Industry evidence

The Australian Government describes the role of building management systems in supervising commercial HVAC equipment. Australian Government HVAC guidance on building management systems

Verifying performance after a portfolio controls retrofit

A controls upgrade is completed in stages. Comparing utility bills before and after can mix changes in weather, floor occupancy, tenant fit-outs and the retrofit itself. The owner needs to know which sites merit the next investment.

Workflow at a glance
  1. Source recordsMeters and change register
  2. ProcessingBuild comparison periods
  3. Decision ownerEnergy manager
  4. Operational outputReproducible performance report

Implementation approach

Record commissioning dates, meter boundaries, plant configuration, weather and operating hours. Build a building-specific baseline and a register of material changes. Compare only periods the energy manager considers representative.

Exceptions and operating controls

Flag missing meters, changed loads and manual overrides. The measurement specialist approves exclusions and the claim boundary. Keep separately measured and modelled figures visibly distinct.

Illustrative operating scenario

A building adds a laboratory during the verification period. The portfolio view shows the new load and its meter coverage so the reviewer can qualify the comparison.

Acceptance test and handover

Deliver the input data, baseline assumptions, excluded periods and sensitivity checks. A second reviewer should be able to reproduce the result building by building.

Industry evidence

The project team reports measured energy savings for nine campus plants after a full measurement and verification period. Exergenics · University of Melbourne central plants