Concept Design

Mining & resources

For resource operators coordinating material quality, equipment availability and a mine-to-port supply chain across operating sites.

Tracing a stockpile blend from laboratory sample to shipment

Mine planning tracks material movements, the laboratory reports samples and the port builds a cargo. A late assay or changed stockpile identity can leave commercial and operational teams using different estimates of the same parcel.

Workflow at a glance
  1. Source recordsMovement and assay records
  2. ProcessingReconstruct material lineage
  3. Decision ownerMetallurgy and planning
  4. Operational outputReviewed cargo quality record

Implementation approach

Build a lineage record for material movement, stockpile additions and reclaim, sample collection, assay revision and shipment assignment. Preserve when the sample was taken and when its result became available to the planner.

Exceptions and operating controls

Metallurgy staff approve quality interpretation and treatment of missing or unrepresentative samples. Show estimated and measured quantities separately, including the basis for moisture conversion.

Illustrative operating scenario

An assay is revised after part of a stockpile has been reclaimed. The planner can identify which cargo estimates depended on the earlier value and which loads were unaffected.

Acceptance test and handover

Trace a sample of shipped parcels in both directions. Review unexplained material, timing differences and uncertainty with metallurgy and commercial leads before using the data in shipment decisions.

Industry evidence

The authors examine how sampling quality affects the ability to compare material through a mining operation. AusIMM technical paper on sampling station quality

Rio Tinto describes the port facilities that link its iron ore operations with export shipping. Rio Tinto · Pilbara rail and port operations

Converting a fleet condition alert into executable maintenance work

A remote monitoring team can see a developing equipment issue while the mine plan still allocates the machine and the maintenance system has no parts or access window reserved. More alerts can increase the backlog without changing asset availability.

Workflow at a glance
  1. Source recordsCondition trends and component IDs
  2. ProcessingLink to executable work
  3. Decision ownerReliability engineer
  4. Operational outputPlanned inspection or repair

Implementation approach

Link the condition evidence to the actual equipment and component, existing maintenance strategy, parts availability and next feasible work window. Group repeat indications against an active investigation and retain the trend behind the recommendation.

Exceptions and operating controls

The reliability engineer confirms the diagnosis and site personnel decide how to manage the asset. Never turn a sensor alert directly into equipment control. Escalate missing context or a maintenance deferral with a named owner.

Illustrative operating scenario

A monitored component moves between units. The reliability lead traces the serialised component history before asking planners to reserve parts for the correct machine.

Acceptance test and handover

Review past alerts through inspection, work order and verified repair. Track repeated unsupported alerts, actions deferred without review and faults where the monitoring data stopped unexpectedly.

Industry evidence

BHP’s published role description illustrates the specialist reliability and asset-health work supporting mining equipment. BHP · Asset health development in mining operations

The model code covers plant across its lifecycle, including installation, commissioning, alteration and maintenance. Safe Work Australia on plant risk management

Replanning ore movements after rail or port availability changes

A mine, train operator and port terminal may each publish a valid local plan. When a planned train path moves, stockpile capacity and vessel loading commitments can cease to match across the network.

Workflow at a glance
  1. Source recordsMine, rail and port plans
  2. ProcessingTrace changed dependencies
  3. Decision ownerSupply-chain planner
  4. Operational outputAccepted movement revision

Implementation approach

Create a shared view of parcel readiness, planned movements, feasible receiving capacity and nominated shipment. Version each planning assumption and record which counterparties accepted a revised movement.

Exceptions and operating controls

Dispatchers and authorised rail and port teams retain operating authority. Keep physical inventory, forecast production and confirmed capacity distinct. Flag a plan that depends on an unconfirmed handoff.

Illustrative operating scenario

A vessel call shifts while an inbound parcel is still moving. The supply planner sees which stockpile was reserved, what could be displaced and which sites need to accept a revised sequence.

Acceptance test and handover

Replay a disruption across multiple shifts. Trace missed commitments to their first changed dependency and test the fallback when one site’s planning feed stops.

Industry evidence

Rio Tinto describes the port facilities that link its iron ore operations with export shipping. Rio Tinto · Pilbara rail and port operations

Discuss a workflow All case studies