Concept Design

Water & wastewater

For utilities connecting network operations, field crews, laboratories and the controlled asset register.

Prioritising leakage investigations and proving the repair changed flow

District-meter flows can indicate a change, but planned network reconfiguration, meter drift and legitimate demand can produce similar signals. A work order marked repaired is insufficient evidence that the original loss was addressed.

Workflow at a glance
  1. Source recordsDistrict flow and GIS boundaries
  2. ProcessingCheck demand and network changes
  3. Decision ownerNetwork operations
  4. Operational outputVerified investigation outcome

Implementation approach

Connect district boundaries, meter status, comparable demand periods, known operational changes and field findings. Rank investigations for the network team and link completed repairs back to the original observation window.

Exceptions and operating controls

Operators confirm the effective network configuration and field crew priorities. Flag boundary or meter changes that invalidate comparison and keep uncertain estimates separate from verified physical findings.

Illustrative operating scenario

Night flow rises after two zones are temporarily linked. The review shows the boundary change before dispatch; a separate persistent rise in a stable zone remains available for field investigation.

Acceptance test and handover

Compare flagged events with confirmed repairs and valid post-repair periods. Review unnecessary dispatches, time to field verification and losses that cannot yet be quantified.

Industry evidence

Sydney Water reports on leakage management as part of its wider water conservation programme. Sydney Water water conservation plan and performance report

Following a water-quality sample from collection to reviewed result

The sampling plan, field label and laboratory system can each identify a location differently. A corrected result or invalid sample can arrive after an operations team has already reviewed the original report.

Workflow at a glance
  1. Source recordsSampling plan and custody record
  2. ProcessingMatch accession and revisions
  3. Decision ownerWater-quality officer
  4. Operational outputReviewed monitoring evidence

Implementation approach

Create an event history from scheduled sample to collection, chain of custody, laboratory accession, result revision and authorised review. Cross-reference sampling points to the relevant network location and effective monitoring plan.

Exceptions and operating controls

The water-quality team interprets results and owns escalation under its approved procedures. Flag missing or compromised evidence and late revisions without inferring water safety from a single reading.

Illustrative operating scenario

The laboratory issues a corrected report after a sample label was resolved. Operations receives the update against the original sample and records the authorised review of the replacement.

Acceptance test and handover

Test late arrival, recollection and corrected results. Trace from a published internal report back to the exact result version and confirm unresolved samples remain visible.

Industry evidence

The guidelines distinguish monitoring activities and provide a framework for verification of drinking water quality. NHMRC · Australian Drinking Water Guidelines on monitoring

Bringing a new main or pump asset into operational records

A project may reach practical completion before corrected as-built geometry, equipment identifiers and service obligations reach GIS and maintenance. A field crew can be dispatched against a proposed drawing after the installation changed.

Workflow at a glance
  1. Source recordsAs-constructed and commissioning files
  2. ProcessingValidate spatial and asset IDs
  3. Decision ownerUtility asset custodian
  4. Operational outputAccepted operating register

Implementation approach

Map construction submission, survey geometry, commissioning evidence and equipment schedules to the operating register. Compare the accepted as-built revision with the design and identify affected maintenance routes and spare-parts records.

Exceptions and operating controls

The utility’s asset custodian accepts or rejects the handover. Record provisional assets separately and retain the survey or drawing source. GPS proximity alone cannot confirm the correct network connection.

Illustrative operating scenario

A pipe section is rerouted around an obstruction. The handover identifies which connection changed and which maintenance map still shows the original design before field release.

Acceptance test and handover

Sample assets from approved records in the field and trace back to signed handover evidence. Rehearse a corrected survey and verify that the superseded record cannot re-enter the operating map.

Industry evidence

Sydney Water specifies the asset information required when construction records are submitted for handover. Sydney Water work-as-constructed asset information specification