Prioritising leakage investigations and proving the repair changed flow
District-meter flows can indicate a change, but planned network reconfiguration, meter drift and legitimate demand can produce similar signals. A work order marked repaired is insufficient evidence that the original loss was addressed.
- Source recordsDistrict flow and GIS boundaries
- ProcessingCheck demand and network changes
- Decision ownerNetwork operations
- Operational outputVerified investigation outcome
Implementation approach
Connect district boundaries, meter status, comparable demand periods, known operational changes and field findings. Rank investigations for the network team and link completed repairs back to the original observation window.
Exceptions and operating controls
Operators confirm the effective network configuration and field crew priorities. Flag boundary or meter changes that invalidate comparison and keep uncertain estimates separate from verified physical findings.
Illustrative operating scenario
Night flow rises after two zones are temporarily linked. The review shows the boundary change before dispatch; a separate persistent rise in a stable zone remains available for field investigation.
Acceptance test and handover
Compare flagged events with confirmed repairs and valid post-repair periods. Review unnecessary dispatches, time to field verification and losses that cannot yet be quantified.
Industry evidence
Sydney Water reports on leakage management as part of its wider water conservation programme. Sydney Water water conservation plan and performance report